Save these instructions – Gotham ICO-SQ Mounting Frame Manuel d'utilisation

Page 2

Advertising
background image

T-Bar

Channel

Bar

Support wire

CJ5200912 Rev. C

11/2013 2 of 6

©2010, 2012 Acuity Brands Lighting, Inc.

All Rights Reserved

.

SAVE THESE INSTRUCTIONS

Upon receipt, thoroughly inspect for any
freight damage which should be brought
to the attention of the delivery carrier.
Compare the catalog description listed on
the packing slip with the label on the
carton to ensure you have received the
correct merchandise.

INSTALLATION INSTRUCTIONS

ICO & ICO-SQ

Mounting Frame

IMPORTANT SAFETY INFORMATION

For Your Protection, Read Carefully

Warning: Risk of fire. Do not install
insulation within 3 inches of fixture
sides or wiring compartment, nor above
fixture in such a manner as to entrap
heat.

Electric current can cause painful
shock or serious injury unless handled
properly. For your safety, always
remember the following:

• Turn off the supply power.
• Ground the fixture to avoid potential
electrical shocks.
• Do not handle an energized fixture or
energize any fixture with wet hands,
when standing on a wet or damp surface,
or in water

New Installation

Lay-in panel T-bar ceilings:

1.

Cut ceiling opening slightly larger than the
outside diameter on the mounting frame. ICO
4” opening – 5-1/16”, 6” opening – 6-15/16”.

2.

Position mounting frame neck through opening
in ceiling. Adjust channel bars (shipped
separately) to the correct spacing between T-
bar. Secure channel bars to T-bar by means of
wire ties, screws or as required per local code
(see Figure 1 and 3). Recommended to secure
fixture to structural ceiling utilizing support
wires (provided by others).

3.

Once mounting frame has been secured in
structure, loosen wing nut (shown in Figure 2)
to adjust the mounting frame vertically to align
bottom edge of fixture to either flush or slightly
above (1/8” max) the ceiling line as shown in
Figure 4. Secure mounting frame into position
by tightening wing nut.

4.

Remove knockouts on junction box to feed
power supply to fixture as shown in Figure 5.
Supply wire must meet applicable electrical
codes and be rated for a minimum of 75°C.
Junction box is thru-wire rated for 8-No. 12
AWG conductors (4in-4out). Driver is standard
with 0-10V dimming capability with wires
provided by others

5.

Complete necessary splices. Snap the
door/driver assembly onto the junction box as
shown in Figure 5

6.

Insure LED heat sink is in the forward locked
position as shown in figure 1.

7.

Install reflector by inserting up and into fixture.
Spring clips will secure reflector into position
when properly installed (square trims mount
same way).

Non-accessible ceiling: (plaster, drywall, etc)

1.

Discard channel bars.

2.

Cut ceiling opening slightly larger than the
outside diameter on the mounting frame.
DLED 4” opening – 5-1/16”, 6” opening – 6-
15/16”.

3.

Secure fixture to structural ceiling utilizing
support wires (provided by others). See Figure
6.

4.

Make sure bottom of the flange is flush with the
bottom of the joists.

5.

Continue with steps 3-7 from lay-in panel, T-bar
ceiling installation instructions.

Wing Nut

Channel Bar

Mounting Bracket

Figure 5

Figure 4

Figure 1

Figure 2

Figure 3

Ceiling

Mounting

Frame

Reflector

Junction Box

Reflector

Channel
Bar

This device complies with Part 15 of the
FCC Rules. Operation is subject to the
following two conditions: (1) this device
may not cause harmful interference, and
(2) this device must accept any
interference

received,

including

interference that may cause undesired
operation.

Advertising
Ce manuel est liée aux produits suivants: