10 gb, Flue assembly - mounting the hood body – Kuppersbusch USA IKD 12250.0 Manuel d'utilisation

Page 10

Advertising
background image

10

GB

12c

8a

8b

12f

24

12e

Cmd

12c

Flue assembly - Mounting the hood body

• Position the upper chimney section and fix the

upper part to the frame using the 2 screws 12c
(2,9 x 9,5) provided.

• Similarly, position the lower chimney section and

fix the lower part to the frame using the 2 screws
12c (2,9 x 9,5) provided.

Recirculation version
• Make sure that the outlet of the extension pieces

14.1 is horizontally and vertically aligned with
the chimney outlets.

• If this is not the case, remove the lower chimney

section and adjust the position by either revers-
ing the connection extension pieces 14.1, then
reassemble as described previously.

• Fit the directional grids 8a - 8b in their housings

making sure that the directional symbols are
towards the top. Also make sure that they are
correctly inserted in the connection extension
pieces 14.1.

Before fixing the hood body to the frame:
• Remove the grease filters from the hood body.
• Remove any activated charcoal filters.
• From below, use the 4 screws 12f (M6 x 10)

provided to fix the hood body to the frame.

ELECTRICAL CONNECTION

• Connect the hood to the mains through a two-

pole switch having a contact gap of at least 3
mm.

• Remove the grease filters (see paragraph

Maintenance) being sure that the connector of
the feeding cable is correctly inserted in the socket
placed on the side of the fan

• Connect the control connector Cmd.
• Place the connector in the junction box 24 and

close it using the 2 screws 12e (2,9 x 9,5)
provided.

• Fix the junction box to the hood body using the 2

screws 12c (2,9 x 6,5) provided.

• For the recirculation version, fit the activated

carbon odour filter.

• Replace the grease filters.

Advertising