Assembly step 2, Open hardware bag 2, Step 4 – Horizon Fitness CT5.1 Manuel d'utilisation

Page 7

Advertising
background image

7

ASSEMBLY STEP 2

A

Open hardware bag 2.

B

Pull lead wire through right console

mast. After pulling the lead wire through the
mast, the top of the console cable should
be located at the top of the mast. Detach and
discard the lead wire.

C

With the running deck in the raised
position, attach the right console

mast to the base frame using 4 bolts

(a), 4 spring washers (b) and 4 flat

washers (c).

NOTE: Be careful not to pinch any wires
while assembling the right console mast.

BOLT (A)
20 mm
Qty: 4

SPRING WASHER (B)
15 mm
Qty: 4

FLAT WASHER (C)
15 mm
Qty: 4

HArDWArE BAG 2 CONTENTS :

BOLTS (A)

SPRING WASHERS (B)

FLAT WASHERS (C)

RIGHT CONSOLE MAST

CONSOLE CABLE

LEAD WIRE

BASE FRAME

RUNNING DECK

NOTE: Do not completely tighten any
screws or bolts until

step 4

is complete!

Advertising