Index – Reznor HRPD Unit Installation Manual Manuel d'utilisation

Page 31

Advertising
background image

Formulaire I-RP/HRPD-FR, NP 263289R5, Page 31

INDEX

A

d'air d’alimentation 13

B

Burner Air Adjustment 23

Burner Rack Removal 26

Burners 23

C

Check Installation After Startup 25

Check Installation and Start-Up 24

Chicanes d'échangeur de chaleur 30

Cleaning Pilot and Main Burners 27

Cleaning the Heat Exchanger 27

Clearances 6

Combustion Air Proving Switch 17

Combustion Air Requirements 3

Control Wiring 15

Conversion du modèle RP en une applica-

tion à haut débit 29

D

Dimensions 5

Disconnect Switch 14

Distributor 32

Duct Connections 11

Optional Ductstat 18

Ductstat Control 18

Duct Temperature Sensor Location 18

E

Electrical Supply 14

Optional Electronic Modulation 18

Electronic Modulation 19

Étiquette de conversion 29

G

Gas Connection Requirements 8

Gas Controls 17

Gas Piping and Pressures 7

Gas Valve 17, 26

H

Hazard Labels 2

I

Ignition Controller 22

Installation Codes 3

L

Limit 17

Furnace Location 3

M

Maintenance Procedures 26

Maintenance Schedule 25

Option AG39 Manifold Arrangement 19

Manifold or Orifice (Valve Outlet) Pressure

Settings 8

Mounting 6

P

Valeur en pi³/min supérieure 29

Pilot and Ignition Systems 22

Preparing the Furnace for Installation 4

Pressure Drop 10

R

Réglage des contrôleurs d'étage de chaleur

20

S

Shipped-Separate Components 4

Startup 24

Supply Voltage 14

T

Thermostat 14

Troubleshooting 28

Troubleshooting Guides for Checking Bypass

Combustion Air Damper Safety 21

Tuyauterie d’alimentation en ga 8

Optional Two-Stage Operation 17

U

Uncrating 4

V

Venting 9

Optional Vertical Flue Discharge (Option CC3)

9

W

Weights 6

Advertising
Ce manuel est liée aux produits suivants: