Candy P 700__1 SP CX Manuel d'utilisation

Page 18

Advertising
background image

INSTRUCTIONS FOR ASSEMBLY OF THE HOB

TO THE GAS SUPPLY PIPES

These instructions are for Fitters qualified for installation of equipment in line with the
relevant national standard. All work must be carried out with the electricity supply dis-
connected.

ASSEMBLY PROCEDURE

2 Spanners, sizes 17 and 23 mm are required.

1/2 GAS

A) As illustrated, as-
semble parts in se-
quence:
A) fixed pipe
B) washer
C) Elbow fitting with

tapered thred
connection

2) Tighten the joints
with the Spanners,
remembering to twist
the pipes into position
before tightening.

3) Attach fitting C to
mains gas supply us-
ing rigid copper pipe
or flexible steel pipe.

VERY IMPORTANT

For ease of installation and to avoid gas leaks, it is recommended to con-
nect the pipes as follows:
First connect the pipe to the Hob
and then
Connect the pipe to the gas supply.
In this sequence is not followed, there is a danger that gas will be trapped
in the pipe.

AFTER INSTALLATION, CHECK THE TIGHTNESS OF ALL JOINTS USING

A SOAPY SOLUTION

31

Grafica R.B.

- 09/2001

- Cod.

91500227.A

Advertising