Commissioning

Work on the boiler must be carried out by a competent person, using

correctly calibrated instruments with current test certification.

These installation instructions are intended for professional installers, who

have the necessary knowledge and are approved for working on heating and

gas systems.

Before the boiler is fired, ensure that the boiler and the system are well de-aerated
and free of air. Purge the gas line between the gas meter and the boiler.

The boiler and its individual shut off valve must be disconnected from the

gas supply piping system during any pressure testing of that system at test

pressures in excess of 1/2 PSI (3.5kPa).

To commission the boiler the casing has to be removed.
-

remove the 4 screws A,B,C and D in the quick releases of the casing (figure 23);

- remove the screw E behind the door on the front of the casing (figure 23);
- remove it towards the front.

The boiler settings, such as burner pressure and adjustment of the air quantity are
unnecessary, due to the fact that the boiler operates with a zero pressure control.
This means the correct gas quantity is controlled by the suction operation of the fan.

The fine adjustment which is carried out at the factory is once-only, which means
that adjusting of these values is unnecessary. Only in case of replacing of the gas
valve, venturi and/or fan, the zero pressure and the incorrect O

2

adjustment has to

be checked and, if necessary, adjusted at the right value.

Always check the installation of all parts through which gas flows (by bubble

test using leak-search spray)

During the commissioning of the boiler the Rinnai Installation, Commissioning, and

Service card must be filled out.