ments and piping requirements are fulfilled, install piping
as follows:

A. In accordance with the above piping requirements,

assemble piping, sediment trap, shutoff valve, and
necessary fittings. Tighten all components securely.

WARNING: Failure to ensure that male threads on

pipe to be installed into gas valve meet the require-
ments of Figure 6 may cause gas valve damage,
distortion and malfunction.

B. Install a threaded nipple, prepared in accordance

with paragraph 3.2 into gas valve.

C. Connect gas piping to nipple installed in the gas

valve.

SUPPLY
LINE

SHUTOFF
VALVE

1/2”
TEE

3”

CAP

NIPPLE

HEATER

RIGID PIPE WITH
UNION OR A FLEXIBLE
CONNECTOR TO HEATER

Figure 7. Typical Piping Installation

NOTE:
1. ONLY USE A PIPE COMPOUND

WHICH IS RESISTANT TO
LIQUIFIED GASES ON LP
INSTALLATIONS.

2. FITTINGS SHOWN ARE NOT

INCLUDED WITH HEATER.

WARNING: When testing gas piping use only a soap

and water solution. Do not use a match or other flame
for leak testing. If during leakage check gas is
smelled, turn off the gas supply and ventilate building.

D. Ensure the building is properly ventilated. Without

lighting the pilot light of the heater, open the gas
supply valve and pressurize the piping up to the
heater’s gas valve.

E. Using a brush, apply a soap and water solution to all

connections and look for bubbles indicating a leak. If
a leak is detected, turn off gas supply and tighten
connections. Retest and tighten connections until no
more leaks are found.

9

Installation instructions and Owner’s Manual

Model # MH25NG/LP

HS25NG/LP