Installation, En 8 8, Wall drilling and bracket fixing – Franke Consumer Products FMY 367 Manuel d'utilisation

Page 8

Advertising
background image

EN

8

8

INSTALLATION

Wall drilling and bracket fixing


Wall marking:
• Draw a vertical line on the supporting wall up to the ceiling, or as high as practical, at the

center of the area in which the hood will be installed.

• Draw a horizontal line at 36” above the hob.
• Place bracket 7.2.1 on the wall as shown about 1/16” from the ceiling or upper limit aligning

the center (notch) with the vertical reference line.

• Mark the wall at the centers of the holes in the bracket.
• Place bracket 7.2.1 on the wall as shown at X” below the first bracket (X = height of the up-

per chimney section supplied), aligning the center (notch) with the vertical line.

• Mark the wall at the centers of the holes in the bracket.
• Mark a reference point as indicated at 4” 9/16 from the vertical reference.
• Repeat this operation on the other side.
• Drill ø 5/16” holes at all the center points marked.
• Insert the wall plugs 11 in the holes.
• Fix the lower bracket 7.2.1 using the 12a screws supplied.
• Fix the upper bracket 7.2.1 and the air outlet connection support 7.3 together using the 2

screws 12a supplied.

• Insert the two screws 12a supplied in the hood body fixing holes, leaving a gap of 3/16 ”

between the wall and the head of the screw.

7.2.1

1÷2

X

36" min

11

12a

4" 9/16 4" 9/16

Advertising