Install the ductwork, Install support system – FRIGIDAIRE PL36PC50EC Manuel d'utilisation

Page 5

Advertising
background image

- 5 -

INSTALL THE DUCTWORK

(DUCTED HOODS ONLY)

!

CAUTION: To reduce the risk of fire, use only metal ductwork.

1. Decide where the ductwork will run between the hood and the outside.

2. A straight, short duct run will allow the hood to perform most efficiently.

3. Long duct runs, elbows, and transitions will reduce the performance of the

hood. Use as few of them as possible. Larger ducting may be required for best

performance with longer duct runs.

4. Install a roof or wall cap. Connect round metal ductwork to cap and work back

towards hood location. Use duct tape to seal the joints between ductwork sec-

tions.

FIG. 4

INSTALL SUPPORT SYSTEM

1. At hood location, install 2 X 4 cross framing between ceiling joists using

dimensions shown.

2. Finish the ceiling surface. Be sure to mark the location of the ceiling joists and

cross framing.

3. Secure the support frame bracket to joists and cross framing with four screws

provided (6x70mm) and four washers (D. 6.4mm). Make sure screws are driven

into center of joists and framing for maximum strength. Be careful, because the

position of the bracket determines the final position of the apparatus: the side with

the slot B corresponds to the side opposite the controls. Fig. 5.

4. Fix the support frame to the support frame bracket with (4) 3.9x9.5mm mounting

screws. Fig. 6.

5. Adjust the overall height of the support frame. Loosen and re-tighten the 4 screws

in the height adjustment slots as necessary.

HEIGHT
ADJUSTMENT
SLOTS

SUPPORT

FRAME

TOP VIEW OF SUPPORT FRAME

HOOD

ROUND

ELBOW

ROUND

DUCT

ROOF CAP

DECORA-

T I V E

F L U E

24” TO 30” ABOVE

COOKING SURFACE

EAVE

VENT

6” ADAPTER

DRYWALL

8

1

/

16

CROSS FRAMING

CEILING

JOISTS

MOUNTING SCREWS

(6x70mm)

WASHERS

(Ø6.4mm)

SLOT B

FRONT

8

1

/

16

5

15

/

16

MOUNTING SCREWS

(3.9x9.5mm)

FRONT

FIG. 5

FIG. 6

FIG. 7

Advertising