Operation of the proofer – Doyon E236TLO Manuel d'utilisation

Page 12

Advertising
background image

A-8

OPERATION OF THE PROOFER

1. Switch "ON" (1).

2. Set the thermostat control and humidity control according to the chart below.

Temp. F

RH +/-5% Hum. position

90

75

4

95

4 1/2

95

75

4

95

4 1/2

100

75

4

95

4 1/2

110

80

4 1/2

90

5

3. If there is too much fog and water drips from the glass doors, adjust humidity control to a lower

number.

4. When the temperature is stabilised, put the products in the proofer.

5.

IMPORTANT:

When proofing cycle is completed, turn the humidity switch to "OFF" and

let the motor blower and air heat element run for 10-15 minutes to let dry the proofer. Then, turn
the main switch ‘’OFF’’ (0), and leave the door ajar to prevent moulding.

When the proofer is not in operation, open the doors to let out the humidity and to prevent
mould.

P.S.

During operation, the doors should not be opened unnecessarily to conserve the heat and
humidity in the proofer.

USE SOFT WATER ONLY.
Cleaning the water pan on top of the proofer periodically can prevent mineral problems.

Advertising
Ce manuel est liée aux produits suivants: