Wiring connections, Medium duty logic – Controlled Products Systems Group CPS-RPEN4 Manuel d'utilisation
Page 4

4
WIRING CONNECTIONS
Be sure power to the operator is disconnected. Do not run control wiring in the same conduit
with AC power.
The wire cable is intended to aid in installation to either a junction box on the wall or can be routed through
the control station mounted next to the door allowing the wires to run in the same conduit as the controls. The
photoelectric sensor also is capable of receiving a 1/2" thread conduit.
Connect the photoelectric sensor as illustrated below for your operator type. The wiring is polarity sensitive so
make certain to wire as indicated below.
TTC
24VAC
24VAC
LMEP:
EDGE:
OPEN
CLOSE
MAS
COMMON
TIMER
DEFEAT
POWER
TIMER
ENABLE
3
3-PHASE
1-PHASE
Blue
Brown
LOGIC 4
LOGIC 4 - INCORPORATING THE CONTROL STATION
Control Board
^^^^
D14
COM
INTRLK
STOP
LED
OPEN
CLOSE
TTC
LEARN
1
LMEP1
LMEP2
2
3
45
67
ST
OP
CLOSE
OPEN
Blue
Brown
MEDIUM DUTY LOGIC
Control Board
COMMERCIAL DOOR OPERATORS
MODELS FDC, FDCL, FDOA, AND FDOB
J2
1 2 3 4 5 6 7 8 9 10 11 12
13 14 15 16 17 18 19 20 21 22 23 24
Blue
Brown
Control Board
Maintenance
Alert LED
Wire
Nut
Brown
Blue
Control
Station
Control Board
This method requires one additional
wire connection from the operator to
the control station (total of 6 wires
from the operator to the control
station is recommended).