Installation in new construction, Wall inlet rough-in, Nutone inlet rough-in – NuTone CV570 Manuel d'utilisation

Page 4

Advertising
background image

4

INSTALLATION IN NEW CONSTRUCTION

Once the locations for wall inlets have been determined, mount

all inlet brackets.

1. Choose the appropriate mounting bracket for the inlet being

installed. (See chart.)

2. To locate bracket on wall stud, measure approximately 18" up

from finished floor level. (Height may vary according to
individual preference.)

MODEL 361 (FOR USE WITH 360 INLETS)

3. Refer to Figure 7. Nail bracket to side of stud so that front

edge of bracket is flush to front of stud. (The bracket may also
be nailed to the front edge of the stud. See face mounting
illustrated. For face mounting, use locating tabs on bracket for
proper alignment.)

4. Refer to Figure 8. Remove cardboard from plaster guard

frame. Using four (4) provided screws, attach the appropriate
flanged fitting and inlet seal to back of inlet.

5. Replace cardboard in plaster guard frame.

MODEL 329 (FOR USE WITH 330 INLETS)

6. When using Model 329, glue elbow to mounting plate. Attach

to stud as shown in Figure 9.

SIDE

MOUNTING

FACE

MOUNTING

MODEL 361

2

3

/

8

"

1

13

/

16

"

FIGURE 7

FIGURE 8

WALL INLET ROUGH-IN

SIDE

MOUNTING

M

TH

2

3

/

8

"

M

FIGURE 9

NuTone Inlet

Rough-in

330 Series

329

360 Series

361

CI390 Series Electrified Inlet

CI390RK

Advertising
Ce manuel est liée aux produits suivants: