Water supply, Installation instructions, 13 turn on the power – GE 48 Manuel d'utilisation

Page 39: 12 connect water supply

Advertising
background image

13 TURN ON THE POWER

Set the Master Power switch to the I (ON)

position.

Check to make sure power to refrigerator is on

by opening refrigerator door to see if interior
lights are on.

The temperature controls are preset at 37°F

for the Fresh Food section and 0°F for the
Freezer section.

Allow 24 hours to stabilize before making

adjustments.

Raise
Grille
Panel

Water Filter

Master

Power Switch

12 CONNECT WATER SUPPLY

Check to make sure that Master Power switch
is in the O (OFF) position.

Locate and bring GE SmartConnect

tubing

to the front of the cabinet.

Turn the water on to flush debris from line.

Run about a quart of water through tubing
into a bucket, then shut off water.

Copper Tubing
Slip a 1/4

nut and ferrule onto end

of copper tubing. Insert tube into the union
fitting on the unit and tighten nut to union.

Turn on the water to check for leaks.

GE SmartConnect

Tubing

Insert the molded end of the tubing

into the refrigerator connection. Tighten
the compression nut until it is just hand tight.

Tighten one additional turn with a wrench.

Overtightening can cause leaks.

Turn on the water to check for leaks.

Note: Make sure excess tubing length does not
interfere with toekick installation.

Refrigerator

Water Supply

House

Water Supply

Installation Instructions

39

Advertising