Cabinet preparation – DCS CP-364GD Manuel d'utilisation

Page 15

Advertising
background image

CABINET PREPARATION

13

6. Cut the openings for the following installation:

Standard counter top installation, see Fig. 8A

Deep counter or island installation, see Fig. 8B

NOTE:

If the deck is used, the sides or bottom of the cutout may be solid
combustible or non-combustible material. If the bottom is solid, provide
a 6" x 6" cutout in the left rear corner for the gas inlet and power cord
clearance. See Fig. 6.

Flush with cabinets

Front projects outward as shown

from standard depth cabinet.

Front flush with cabinets; a minimum

of 25

3/4"

cabinet depth required

Fig. 4

Front flush with cabinets; a minimum of 25-3/4”

cabinet depth required

Front projects outward as shown

from standard depth cabinet.

Flush with cabinets

Counter-Sunk Screws

Fig. 5

Counter-Sunk Screws

Fig. 6

6

6

Cutout

Advertising
Ce manuel est liée aux produits suivants: