Installer final checklist – DCS T-365BK Manuel d'utilisation

Page 12

Advertising
background image

INSTALLER FINAL CHECKLIST

11

GENERAL

❏ Placement of Unit.

❏ Specified clearance maintained to cabinet

surfaces.

❏ Unit Level- front to back, side to side.

❏ All packaging material and tie straps

removed.

ELECTRICAL:

❏ Receptacle with 15 ampere circuit

protection is provided for service cord
connection.

❏ Adequate ground connection.

GAS SUPPLY:

❏ Connection: 1/2 NPT with a minimum 5/8”

diameter flex line.

❏ The pressure regulator which is connected

to the manifold is set for 4.0” W.C. for Natural
Gas or 10” W.C. for LP.

❏ Manual gas shut-off valve installed in an

accessible location.

❏ Unit tested and free of gas leaks.

OPERATION:

❏ All internal packing materials are removed,

i.e. below grates, around knobs, etc.

❏ Bezels centered on burner knobs and knobs

turn freely.

❏ Each burner lights satisfactorily, both

individually and with other burners
operating.

❏ Low flame operation verified.

❏ All burner caps, burner rings and burner

bases correctly seated in position, level, and
do not rock or slide.

❏ Burner grates correctly positioned, level, and

do not rock.

Advertising