Bulletin 592 Eutectic Overload Relay Installation

(Cat 592-EUTB; 592-EUTC; 592-EUTD; 592-EUTE)

PN-68115
DIR 10000093748 (Version 01)

Printed in U.S.A.

Bulletin 509 Size 0, 1, 2

3

1

4

2

Lugs for Size 2 Only

35 lb-in



12 lb-in



16 lb-in



To Replace Existing Overload Relay

- Disconnect power wires and control wires from overload relay.
- Remove the two screws that secure the overload relay to the mounting plate.
- Loosen, but do not remove the screws that connect the overload relay terminals to the contactor terminals.
- Lift overload relay away from mounting plate and slide away from contactor to remove.

Power Connections

NEMA Size

Wire

Range
(AWG)

0, 1

2

14 - 8

14 - 4

Wire

Range
(AWG)

Tightening

Torques

(Wire in Lug)

Tightening

Torques

(Wire in Lug)

18 - 12

18 - 12

12 lb-in



12 lb-in



23 lb-in



45 lb-in



Control Connections

To prevent electrical shock, disconnect from power source before installing or servicing. Install in suitable enclosure. Keep free
from contaminants.

Avant le montage et la mise en service, couper l'alimentation secteur pour éviter toute décharge. Prévoir une mise en coffret ou
armoire appropriée. Protéger le produit contre les environnements agressifs.

Desconéctese de la corriente eléctrica, antes de la instalación o del servicio, a fin de impedir sacudidas eléctricas. Instálelo en una
caja apropiada. Manténgalo libre de contaminantes.

WARNING

AVERTISSEMENT

WARNUNG

L3

L2

L1

T3

T2

T1

Motor

NC

NC

L3

L2

L1

T3

T1

Motor

CAT

23 lb-in

35 lb-in

CAT

592-EUTB

592-EUTC

NEMA Size 0, 1

NEMA Size 0, 1, 2, 3, 4

(3 Phase)

(Single Phase)

NEMA Size 2

NOTE:

3 heater elements are required for both single phase and 3 phase applications