Part # 1009086 (01/31/08)

Page 6

The Garland 36E series complies with the standards CSA
C222 no. 109-latest edition, the UL197-latest edition and the
NSF #4 latest edition. The installation & Connection of this
appliance must comply with the current codes. In Canada
– the Canadian Electrical Code part 1 and in the USA-The
National Electrical Code.

1. Switch panel size.

2. Overload protection.

3. Wire type.

4. Wire size.

5. Temperature limitations of the wires.

6. Method of connection (Cable, conduit, etc.)

The service line will enter through the rear of the unit and
is to be connected to the terminal block. Input voltage and
phasing must match the units voltage and phasing.

Visual check all electrical connections.

Energize electric service to units.

According to Underwriters Laboratories, Inc. Specifications,
fryers with rated loads above 48 Amperes require divided
branch circuits with overcurrent protection (circuit breaker,
fuses, etc.).

NOTE: Select following installation instruction according to
appropriate model.

Storage Base Models

The internal wiring connection can be accomplished from
the front of the unit.

1. Open front door in storage base and remove field wiring

to terminal box (F.W.T. box) cover, located internally at
rear of cabinet base, by removing fasteners from front
cover. On some models, the fryer tank can be removed for
added convenience.

2. Provide proper output cable hole by removing rings in

F.W.T. box knockout and add appropriate cable for supply
wire.

3. Feed input power cable through rear, snap connector

hole in cabinet base and then into F.W.T. box through
knockout hole/clamp added per 2 above.

4. Attach power input, lead wires to input power terminal

block (single or three phase) according to appliance wire
diagram.

INSTALLATION Continued

5. Replace F.W.T. box cover and attach with two (2) fasteners.

Upon completion of power input supply connection test
fryer for operation by following the procedure as described
in the section “Proper Method of Filling Fryer Tank”.

Counter top/Modular Models – Rated Greater
Than 48 Amperes

NOTE: An externally mounted Field Wiring terminal box
(F.W.T. box) is factory supplied with counter top and modular
models rated greater than 48 amperes, per Underwriters
Laboratories, Inc. requirements.

1. Locate the F.W.T. box, supplied with fryer, and take off

cover by removing the front fasteners.

2. Place F.W.T. box in convenient mounting location and

attach to surface through holes inside rear of box 3.
Provide proper size “Input Power Cable” hole in F.W.T. box
knockout (located below terminal block) add appropriate
cable clamp for input power supply cable.

3. Provide proper size “Input Power Cable” hole in F.W.T. box

knockout (located below terminal block) add appropriate
cable clamp for input power supply cable.

4. Provide proper output branch circuit “appliance supply

Cable” hole in F.W.T. box knockout located below circuit
breakers and add appropriate cable clamp to secure
cable.

NOTE: The appliance supply cable between F.W.T. box and
dryer is NOT factory supplied.

5. Place input power supply cable through knockout hole

provided in F.W.T. box (per 3 above) and attach to field
wiring terminal block (single or three phase as required)
according to appliance diagram supplied.

6. Using wiring diagram as a guide, identify and number

wires on each end of “appliance supply Cable”.

7. Place output branch circuit, “appliance supply Cable”,

through knockout hole provided in F.W.T. box per
(4 above) and attach at proper circuit breaker (output
branch circuit) terminals (see wiring diagram).

8. Open appliance front control panel by removing

fasteners.

9. Run “appliance Supply Cable” to counter top/module

fryer. Feed cable first through rear snap connector hold
and then through knockout in bottom of wiring chamber.