Save these instructions, Installation instructions afv mounting frame – Gotham AFV Mounting Frame Manuel d'utilisation

Page 3

Advertising
background image


Installation Instructions

AFV

Mounting Frame

SAVE THESE INSTRUCTIONS

New Installation for AFV

Lay-in panel T-bar ceilings:

Upon receipt, thoroughly inspect for any
freight damage which should be brought to
the attention of the delivery carrier.
Compare the catalog description listed on
the packing slip with the label on the carton
to ensure you have received the correct
merchandise.

IMPORTANT SAFETY INFORMATION

For Your Protection, Read Carefully

WARNING - Risk of fire. Do not install insu-
lation within 3 inches of fixture sides or
wiring compartment, nor above the fixture in
such a manner as to entrap heat.


1. Electric current can cause painful
shock or serious injury unless handled
properly. For your safety, always
remember the following:

·

Turn off the power supply.

·

Ground the fixture to avoid potential

electrical shocks.

·

Do not handle an energized fixture or

energize any fixture with wet hands,

when standing on a wet or damp surface,
or in water.

. Double check all electrical connections to
be sure they are tight and correct.

























































1.

Cut ceiling opening slightly larger space

than the outside diameter on the moun-

ting frame.

2. Position mounting frame through

opening in ceiling. Release clamping

latch arms and adjust channel bars to

the correct spacing between T-bar as

shown in Figure 1. Secure channel bars

to T-bar by means of wire ties, screws or

by bending ends onto T-bar as shown in

Figure 2.

3. Once mounting frame has been secured

in structure, adjust the mounting frame

vertically to align the bottom edge to

either flush or slightly above (1/8” max)

the ceiling line as shown in Figure 3.

Secure mounting frame into position by

closing the clamping latch arm.

4. IF additional security is required, a No. 8

sheet metal screw, wire tie or wire (not

supplied) may be used to tie the latch

arm to the mounting frame as shown in

Figure 1.

5. Remove knockouts on junction box to

feed power supply to fixture as shown in

Figure 4. Supply wire must meet appli

cable electrical codes and be rated for

a minimum of 75°C. Junction box is thru-

wire rated for 8-No. 12 AWG conductors

(4 in -4 out)

6. Drop socket cup assembly through

mounting frame aperture.

7. Complete necessary splices. Snap the

door/ballast assembly onto the junction

box, as shown in Figure 4. If ballast is

desired on the opposite side of the

junction box, pass the entire door and

ballast assembly through the junction

box

and snap into place.

NEW INSTALLATION FOR AFV

2. Specific safety information concern-

ing lamps:

·

Match wattage of fixture and lamp

exactly.

·

Do not remove or insert lamp when is

on power

·

Do not scratch glass or subject lamp to

undue pressure as either may cause
lamp breakage.

·

Protect operating lamp from sources of

moisture.

·

If lamp is marked

it contains

mercury. Follow disposal laws. See:

www.lamprecycle.org.







Non-accessible ceiling:

1. Release clamping latch arms and adjust

channel bars to the correct spacing

between joists as shown in Figure 1.

Part No. CJ520468 Rev. D

©2010 Acuity Brands Lighting, Inc.

Page 3 of 6

GOTHAM ARCHITECTURAL DOWNLIGHTING

A DIVISION OF ACUITY LIGHTING GROUP , INC.

1400 Lester Road Conyers Georgia 30012

P 800 315 4982 F 770 860 3129

www.gothamlighting.com

Reflector

Advertising