Fixture connections and hanging instructions

4

1/2

3

1/2

3

1/2





4

1/2


Figure 1C


Figure 1D


Figure 2C

Figure 2D

Cord Mount (PDPA and PDPF)

I.

Ground Prep

1. Temporarily remove top cap and any round decorative piece to ex-

pose support bracket.

2. Removing socket assembly from box, attach socket cup to trim (per

trim instructions).

3. Route socket wires through housing, and bundle wires

underneath the L-shaped support bracket (do NOT pass wires

through the bracket center .875 hole).

4. Replace the top cap and round decorative piece, leaving screws

loose for later steps.

5. Measure desired hanging length from ceiling to top of fixture,

then subtract the thickness of the canopy and add 6 inches.

**Ceiling suspension length - canopy thickness + 6 inches = cord

length.**

6. Strip off 4 inches of cord jacket to expose inner conductors. Strip

½ inch from each conductor to expose copper.

7. Secure the provided strain relief bushing with a minimum of 2

inches above the stripped edge of the cord. Use pliers or vice-

grips to crimp around the cord jacket – flat side facing up. IF

ADJUSTMENT IS REQUIRED, USE EITHER A FLATHEAD SCREW-

DRIVER TO PRY-OFF BUSHING AND RECRIMP, OR CUT BUSHING

OFF AND USE EXTRA ONE PROVIDED (See Figure 2C).

8. Remove the fixture cap to expose support bracket and to route

cord through top center hole.

9. VERIFY CORD IS ROUTED THROUGH CAP AND ANY ROUND

DECORATIVE PIECES ARE ON FIXTURE! Align cord-attached

bushing to bracket hole and press firmly into support bracket until

all three snaps engage. Flat ledge of bushing should sit flush with

bracket surface.

10.

!

WARNING! Possible falling hazard and risk of

serious injury. Gather both cord and socket leads into tie

strap strain relief so that a minimum of two inches of cord

conductors with socket conductors are pulled inside tie strap.

Make connections with wire nuts. Pull tie strap tight enough

to strain relieve all connections. Trim excess strap material

(See Figure 2D).

11. Separate j-box mounting pan from top of canopy by loosening the

3 side screws, twisting and removing.

II.

Ceiling Installation

12. Hang mounting pan by routing j-box wires through back of pan,

and using either 3.5 or 4.5 inch key holes, secure to j-box (See

Figure 1C).

13. With canopy and fixture suspended on cord, make power

connections using wire nuts.

14. Align the “V” notch on the outer canopy with the “V” notch inside

the mounting pan. Tuck in all wires, close assembly to mounting

pan and twist to engage screws into L-slots (See Figure 1D).

15. Tighten screws. INSTALLATION COMPLETE.

Part No. CJ52006

©2005 Gotham

Rev. C 01/2014

Elevations

®

-

Part I

GOTHAM ARCHITECTURAL DOWNLIGHTING

A DIVISION OF ACUITY LIGHTING GROUP , INC.

1400 Lester Road Conyers Georgia 30012

P

800 315 4982

F

770 860 3129

www.gothamlighting.com

Advertising
Ce manuel est liée aux produits suivants: