13 / 14 series installation, A. c, Back to back installation – Factory Direct Hardware Delta T14485-H2O Grail Monitor Manuel d'utilisation

Page 5

Advertising
background image

13 / 14 Series Installation

1

Cartridge Installation

A.

C.

Turn off water supplies. Remove

cover (1), bonnet nut (2) and test cap (3)

from the body. If this is not a thin wall

mounting, the entire plasterguard (4)

may be removed. If screen (5) is in place,

remove before installing cartridge.

For back to back or reverse installations

(hot on right and cold on left)

insert the

cartridge with the “hot side” on the right.

If you are not making a reverse or back

to back installation skip this step and

continue with step 1C.

Slide bonnet nut (1) over the cartridge

and thread onto the body. Hand tighten

securely.

B.

Rotate the cartridge (1) so the words

“hot side” (2) appear on the left. Insert

cartridge into valve body as shown. Make

sure the cartridge tubes and O-rings (3)

are properly seated in holes at the base of

the body. Ensure the keys on the body are

fully engaged with the slots in the body (4).

Back to back Installation

Normal Installation (changes not required)

Reverse

Installation

Cold

Hot

1

2

3

1

4

4

2

3

1

3

5

4

Advertising