17t series installation, Back to back installation – Delta MultiChoice Valve Trim 13/14 Series Manuel d'utilisation

Page 13

Advertising
background image

B.

1

4

4

2

3

17T Series Installation

1

Cartridge Installation

A.

Turn off water supplies. Remove

cover (1), bonnet nut (2) and test cap (3)

from the body. If this is not a thin wall

mounting, the entire plasterguard (4)

may be removed. If screen (5) is in place,

remove before installing cartridge.

1

2

3

11

4

Rotate the cartridge (1) so the word

“UP” (2) appears on the top. Insert

cartridge into valve body as shown. Make

sure the cartridge tubes and O-rings (3)

are properly seated in holes at the base of

the body. Ensure the keys on the body are

fully engaged with the slots in the body (4).

For back to back or reverse installations

(hot on right and cold on left): Rotate

cartridge (1) so the word “UP” (2) appears

on the bottom. Install the cartridge making

sure that the keys are fully engaged with the

slot in the brass body (see step B). Slide

bonnet nut (3) over the cartridge and thread

onto the body. Hand tighten securely.

Back to back Installation

Normal Installation

(changes not required)
Reverse

Installation

Cold

Hot

1

3

2

C.

Slide bonnet nut (1) over the cartridge

and thread onto the body. Hand tighten

securely.

1

5

Advertising
Ce manuel est liée aux produits suivants: