13 front fascia installation, 14 tank inhibitor rod installation – Napoleon Grills MIRAGE 605 Manuel d'utilisation

Page 20

Advertising
background image

20

3/8

13

Front Fascia Installation

Attach front fascia to center of support beam. Slide top of fascia up under sup-
port beam as shown, resting bottom on bottom shelf. Fasten with (4) #14 x 1/2”
screws.

4 X
N570-0080 (#14 X 1/2")

14

Tank Inhibitor Rod Installation

Insert one end of tank inhibitor rod into hole in back panel and other end into hole
in back side of fascia as illustrated.

PROPANE ONLY

Advertising