NuTone VSUC4RK Manuel d'utilisation

Page 16

Advertising
background image

• Insert the remaining 3 mounting screws (supplied) and tighten.

• Complete all the connections on the back of the TV/Monitor, if they were not made before attaching the TV/Monitor

to the cabinet.

Using #8 Machine Screws and Threaded Mounting Shafts

• From underneath the cabinet, position the mounting hole template and mark the mounting hole locations.

• From underneath the cabinet, drill a 3/16" hole at each of the marked mounting hole locations. Counter sink holes

from inside cabinet to make screw head flush with cabinet surface.

• Measure the distance between the frame of the cabinet and the bottom of the cabinet. Combine the supplied 1/4",

1/2" and 3/4" round plastic spacers so they will fill the space between the bottom of the cabinet and the frame of
the cabinet.

• Depending on the depth of the cabinet, decide if you need to make all the connections to the back of the

TV/Monitor before fastening the TV/Monitor to the bottom of the cabinet.

• Select a 1 1/2", or 2 1/4" mounting screw (supplied) based on your particular installation. Insert all four (4) mount-

ing screws (supplied) from inside the cabinet.

16

Advertising