Preparing to install the freezer, Freezer location, Clearances – GE FUM9 Manuel d'utilisation

Page 10

Advertising
background image

Consumer Support

Tr

oubleshooting T

ips

Installation Instructions

Safety Instructions

Operating Instructions

Preparing to install the freezer.

Read these instructions completely and carefully.

Freezer Location

Your freezer should be conveniently located for
day-to-day use in a dry, well-ventilated room.

Do not install the freezer where the temperature
will go below 0° F or above 110° F, because it will
not maintain proper temperatures.

Be sure to install your freezer on a floor strong
enough to support it when it is fully loaded.

The freezer must be solidly positioned on the floor
if it is to function at its best. Shims may be used to
accomplish this wherever the floor is too uneven.
If the place selected for the freezer is damp or
moist, place 2 X 4’s (51 mm X 102 mm) under its
entire length to assure adequate support.

Clearances

On all models, allow 3

″ (76 mm) on top, back and

sides for proper air circulation.

Adjustable Legs

(on Upright models)

Legs at the front corners of the freezer
should be set so the freezer is firmly
positioned on the floor, and the front is
raised just enough so the door closes easily
when opened about halfway.

Turn right
to lower

Turn left
to raise

10

Advertising