Installation – FRIGIDAIRE PLHV36W6KC Manuel d'utilisation

Page 5

Advertising
background image

5

Installation

Installation

Installation

Installation

Installation

Preparation of mounting surface (Drywall)

Preparation of mounting surface (Drywall)

Preparation of mounting surface (Drywall)

Preparation of mounting surface (Drywall)

Preparation of mounting surface (Drywall)

1. Select a mounting height comfortable for the user and mark on wall

behind cooktop.

2. Mark center line of cooktop and draw vertical line from bottom of hood

to the ceiling.

3. Tape template, matching center-line and hood bottom as shown in

Figure 2.

4. Mark centers of the 6 fastener locations through template on wall then

remove template.

5. Mark wall with horizontal line 1" above highest and 1" below lowest

fastener location.

6. Find studs behind drywall by

tapping wall or using a stud finder. Mark the center of the studs with a
vertical line to the right and left of the marked fastener location.
Note

Note

Note

Note

Note: 2 x 6's must span at least 2 studs side to side.

7. Cutout drywall along marked lines. Install 2 x 6's between studs firmly

flush with stud front. Make sure all mounting screws will anchor to added
lumber. Replace drywall and refinish.

8. Remark center line and hood bottom on same location as before and tape

template on wall as in step 3 above.

9. Mount 2 mounting hooks with wood screws (supplied in mounting

hardware kit) on locationsmarked on template, then remove template.

10. Install duct cover ceiling bracket to wall flush to ceiling with drywall

anchors supplied. Figure 3.

Figure 2

Figure 2

Figure 2

Figure 2

Figure 2

CL

16

16

Figure 3

Figure 3

Figure 3

Figure 3

Figure 3

Tools required for installation

Tools required for installation

Tools required for installation

Tools required for installation

Tools required for installation
Screw driver
(flat head, pozidrive n°2 and torx 10)

Allen spanner 4mm

Electric drill with twist bit Ø 10 mm

Advertising