Pre-installation checklist, Installation preparation – GE ZGU384L Manuel d'utilisation

Page 6

Advertising
background image

PRE-INSTALLATION CHECKLIST

1. When preparing cooktop opening, make sure

the inside of the cabinet and the cooktop do
not interfere with each other. (See section on
preparing the opening.)

2. Slide the cooktop out of the end of the box.

Remove packaging materials, grate boxes,
regulator and literature package from the
cooktop before beginning installation.

• Use the shipping carton as a pad to protect

customer countertops or flooring.

3. Remove Installation Instructions from literature

package and read them carefully before you
begin.

Be sure to place all literature, Owner’s Manual,
Installations, etc. in a safe place for future
reference.

4. Make sure you have all the tools and materials

you need before starting the installation of the
cooktop.

5. Your home must provide the adequate electrical

service needed to safely and properly use your
cooktop. (Refer to section on electrical
requirements.)

6. When installing your cooktop in your home, make

sure all local codes and ordinances are followed
exactly as stated.

7. Make sure the wall coverings, countertop and

cabinets around the cooktop can withstand heat
(up to 200°F) generated by the cooktop.

Foam support

Packaging containing

left and right side grates

Packaging containing

left and right side grates

Installation Preparation

6

Foam packaging

Regulator taped
to the underside

Advertising
Ce manuel est liée aux produits suivants: