Unpacking the compactor, Installation preparation – GE GCG1580 SS Manuel d'utilisation

Page 6

Advertising
background image

Installation Preparation

6

UNPACKING THE COMPACTOR

1

• Move the compactor close to the installation

location.

• Use a section of the shipping carton to protect the

finished floor.

• Do not use the handle to lift the compactor.

• Remove all protective packaging materials such as

tape or shipping pads. Remove waxy residue caused
by shipping material with a mild solution of liquid
household cleaner and water.

• Check that the power supply cord is attached to the

cord clip on the rear of the compactor.

IMPORTANT: Use the shipping carton as a pad.
Do not slide the compactor across a finished floor.
Damage will occur.

Cord clip

UNPACKING THE COMPACTOR

(CONT.)

• Open the compactor drawer and remove any

shipping materials or other items shipped in the
drawer.

• Do not remove the compactor bag (if installed).

• Grasp the sides of the drawer and lift it out of the

compactor. Place the drawer on a protected surface.
The drawer can scratch a finished floor.

Advertising