Warning, Install vent system, Install leveling legs – Whirlpool Cabrio W10150626A Manuel d'utilisation

Page 10

Advertising
background image

10

Determine vent path

Select the route that will provide the straightest and most
direct path outdoors.

Plan the installation to use the fewest number of elbows and
turns.

When using elbows or making turns, allow as much room as
possible.

Bend vent gradually to avoid kinking.

Use the fewest 90° turns possible.

Determine vent length and elbows needed for best
drying performance

Use the following Vent system chart to determine type of vent
material and hood combinations acceptable to use.

NOTE: Do not use vent runs longer than those specified in
the Vent system chart. Exhaust systems longer than those
specified will:

Shorten the life of the dryer.

Reduce performance, resulting in longer drying times and
increased energy usage.

The Vent system chart provides venting requirements that will
help to achieve the best drying performance.

Vent system chart

NOTE: Performance of rear exhaust to either side of the dryer is
equivalent to adding one elbow. To determine maximum exhaust
length, add one elbow to the chart.

Install Vent System

1. Install exhaust hood. Use caulking compound to seal exterior

wall opening around exhaust hood.

2. Connect vent to exhaust hood. Vent must fit inside exhaust

hood. Secure vent to exhaust hood with 4" (10.2 cm) clamp.

3. Run vent to dryer location. Use the straightest path possible.

See “Determine vent path” in “Plan Vent System.” Avoid 90º
turns. Use clamps to seal all joints. Do not use duct tape,
screws or other fastening devices that extend into the interior
of the vent to secure vent.

Install Leveling Legs

1. To protect the floor, use a large flat piece of cardboard from

the dryer carton. Place cardboard under the entire back edge
of the dryer.

2. Firmly grasp the body of the dryer (not the top or console

panel). Gently lay the dryer on the cardboard. See illustration.

3. Examine the leveling legs. Find the diamond marking.

4. Screw the legs into the leg holes by hand. Use a wrench to

finish turning the legs until the diamond marking is no longer
visible.

5. Place a carton corner post from dryer packaging under each

of the 2 dryer back corners. Stand the dryer up. Slide the
dryer on the corner posts until it is close to its final location.
Leave enough room to connect the exhaust vent or gas line.

For mobile home use

Gas dryers must be securely fastened to the floor.

Mobile home installations require a Mobile Home Installation Kit.
See “Tools and Parts” section for information on ordering.

Number of
90º turns
or elbows

Type of
vent

Box or
Louvered
hoods

Angled
hoods

0

Rigid metal
Flexible metal

64 ft (20 m)
36 ft (11 m)

58 ft (17.7 m)
28 ft (8.5 m)

1

Rigid metal
Flexible metal

54 ft (16.5 m)
31 ft (9.4 m)

48 ft (14.6 m)
23 ft (7 m)

2

Rigid metal
Flexible metal

44 ft (13.4 m)
27 ft (8.2 m)

38 ft (11.6 m)
19 ft (5.8 m)

3

Rigid metal
Flexible metal

35 ft (10.7 m)
25 ft (7.6 m)

29 ft (8.8 m)
17 ft (5.2 m)

4

Rigid metal
Flexible metal

27 ft (8.2 m)
23 ft (7 m)

21 ft (6.4 m)
15 ft (4.6 m)

WARNING

Excessive Weight Hazard

Use two or more people to move and install dryer.

Failure to do so can result in back or other injury.

Advertising
Ce manuel est liée aux produits suivants: