Unpacking the compactor, Installation preparation – GE Built-In Compactors GCG1700 II Manuel d'utilisation

Page 6

Advertising
background image

Installation Preparation

6

UNPACKING THE COMPACTOR

1

• Move the compactor close to the installation

location.

• Use a section of the shipping carton to protect

the finished floor.

• Do not use the handle to lift the compactor.

• Remove all protective packaging materials such

as tape or shipping pads. Remove waxy residue
caused by shipping material with a mild solution
of liquid household cleaner and water.

• Check that the power supply cord is attached to

the cord clip on the rear of the compactor.

IMPORTANT: Use the shipping carton as a pad.
Do not slide the compactor across a finished floor.
Damage will occur.

Cord clip

REPLACING THE DOOR TOEKICK
(Optional for ZCGS150SS and
ZCGP150II Models Only)

2

• Open the compactor drawer and remove any

shipping materials or other items shipped in the
drawer.

• Do not remove the compactor bag (if installed).

• Grasp the sides of the drawer and lift it out of the

compactor. Place the drawer on a protected
surface. The drawer can scratch a finished floor.

ZCGS150SS and ZCGP150II Models are supplied
with extra toekicks that can replace the toekicks
assembled on the compactor.

• Lay the drawer on its side.

• Remove 2 foot pedal screws. Lift off the foot

pedal.

• Remove 2 door toekick screws. Remove door

toekick.

• Install the new door toekick using the original

screws.

• Reinstall the foot pedal using the original screws.

See Step 5 for instructions on replacing the top
toekick and base toekick.

Toekick
screw

Toekick
screw

Toekick

Foot pedal

Advertising
Ce manuel est liée aux produits suivants: